# Project Change Order

> Blueprint change order with a drafted house-extension cover, architect-style title block, cost breakdown, approval stamp and a blank grid-paper form.

Source: https://buildpdfs.com/templates/project-change-order
Category: Legal & Finance

Blueprint change order with a drafted house-extension cover, architect-style title block, cost breakdown, approval stamp and a blank grid-paper form.

## What's included

- Blueprint cover with annotated changes and price/date impact
- Itemised cost breakdown, conditions and sign-off
- Blank fill-in change order on grid paper

## Sample content

Northfield Build Co. · Contract NB-2611 

### Change  
Order 03 

Status **PENDING** 

**ADD**2 fixed skylights

**UPGRADE**4-panel slider, 12 ft

Project 

Okafor residence, rear kitchen extension

Client 

Dami & Grace Okafor

Site 

88 Linden Ave, Evanston, IL

Sheet 

1 of 2

Requested by 

Client, at framing walkthrough

Date raised 

12 March 2027

Prepared by 

Luis Ortega, PM

Respond by 

19 March

#### The change

At the 10 March framing walkthrough the Okafors asked for more daylight over the new kitchen island and a wider opening to the garden.

This order adds two skylights to the extension's flat roof and swaps the approved 9 ft three-panel door for a 12 ft four-panel aluminum slider. The header beam is resized to carry the wider opening.

#### Scope

* Two 24 × 48 in fixed skylights with curbs
* Roof framing, flashing and membrane patch
* 12 ft four-panel slider, black frame
* LVL header resized for the new span
* Electrical for future blinds (not included)
* Interior paint touch-up (in base contract)

Contract price 

Was **$86,400** 

**+$8,635**→

Becomes **$95,035** 

Completion date 

Was **30 Apr** 

**+6 days**→

Becomes **10 May** 

CO-03 · Okafor residence Sheet 1/2 

#### Cost breakdown

CO-03 · Prices in USD, valid 30 days 

| Item                                                                               | Qty     | Unit   | Amount |
| ---------------------------------------------------------------------------------- | ------- | ------ | ------ |
| Skylights                                                                          |         |        |        |
| Fixed skylight, 24 × 48 in, laminated glassSupplier quote Q-7714, 3-week lead time | 2       | $1,090 | $2,180 |
| Roof framing, curbs and trimmersCarpentry crew                                     | 14 hrs  | $90    | $1,260 |
| Flashing kit and membrane patch                                                    | 1 lot   | $420   | $420   |
| Rear opening                                                                       |         |        |        |
| Upgrade to 12 ft four-panel sliderPrice difference over the approved 9 ft door     | 1       | $3,350 | $3,350 |
| LVL header resize, 3½ × 11⅞ in                                                     | 1       | $640   | $640   |
| Subtotal                                                                           | $7,850  |        |        |
| Contractor overhead & profit, 10%                                                  | $785    |        |        |
| Total for this change                                                              | +$8,635 |        |        |

##### Conditions

* Skylights are ordered once this order is signed and 50% of the change ($4,318) is paid.
* Price holds for 30 days. After that the supplier quote may change.
* The 6-day extension assumes delivery by 9 April.

##### Schedule impact

* Roof framing adds 2 days in week 9.
* Slider install and header swap add 4 days in week 10.
* Substantial completion moves from Fri 30 April to Mon 10 May.

**APPROVAL** 
**REQUIRED** No work before  
signatures 

##### Approval

Signing below adds this change to contract NB-2611\. Everything else in the contract stays the same.

**Client: Dami Okafor** Date 

**Contractor: Luis Ortega** Date 

Northfield Build Co. · (847) 555-0126 · office@northfieldbuild.com Sheet 2/2 

#### Blank form · print and fill inChange Order

CO number 

Project 

Client 

Contract no. 

Date raised 

Requested by 

Prepared by 

Site / address 

Respond by 

##### What is changing, and why

##### Not included

| Item                  | Qty | Unit | Amount |
| --------------------- | --- | ---- | ------ |
|                       |     |      |        |
|                       |     |      |        |
|                       |     |      |        |
|                       |     |      |        |
|                       |     |      |        |
| Total for this change |     |      |        |

##### Price

Was 

Change 

Becomes 

##### Completion date

Was 

Change 

Becomes 

##### Decision

Approved Declined 

Client 

Contractor 

Sketch or mark-up 

Keep a signed copy with the contract Form CO-1

[Use this template](https://buildpdfs.com/signup?templateId=project-change-order) — free, no credit card required.